Skip to main content

spans calculator

Header Load Index Calculator

The Header Load Index Calculator applies index = opening × supported width × floors to entered measurements and returns header table lookup index. A numerical default is embedded in the served HTML before JavaScript runs. Use it for planning, then verify field measurements, current codes, product instructions, and structural assumptions before ordering or cutting.

Enter measurements

ft

Enter a positive field measurement in ft.

ft

Enter a positive field measurement in ft.

count

Enter a positive field measurement in count.

Calculated result

144.0 load index

A comparison index combines opening width, supported width, and supported floor count for table lookup.

Supported floors
1

This is not a beam design. Select the final header from the current IRC/AWC table or have a structural engineer verify it.

Header Load Index scaled diagram Scaled planning diagram using the server-rendered default values. opening 6 supported width 24 index 144.0
Scaled visual aid. Dimensions in the result table govern; do not scale a cut directly from the drawing.

Printable result and cut list

Header Load Index default worked result
ItemValueJob note
Primary result144.0 load indexVerify before cutting or ordering.
Supported floors1Calculated from the entered dimensions.
Formula used by this calculator
FormulaExpressionNote
Primary formulaindex = opening × supported width × floorsRound the final result, not each intermediate value.

How the header load index calculation works

Enter the job dimensions in the form. The calculator normalizes the values, applies index = opening × supported width × floors, and updates the main result, supporting values, diagram labels, and print table together.

The first displayed example is calculated during the static build. That makes the formula and a complete numerical result readable in page source, while the browser script handles later input changes.

Worked example

The prefilled values form a complete header table lookup index example. Change one field at a time and compare the updated result with the formula table to catch unit or transcription mistakes.

Common errors to avoid

  • Mixing nominal and actual material dimensions.
  • Entering diameter where the formula expects radius, or total run where it expects one tread.
  • Rounding every intermediate value instead of rounding the final purchase or cut quantity.
  • Treating a planning result as a stamped structural design or local-code approval.

Frequently asked questions

Does the header load index calculator work without JavaScript?

The default worked result, formula, diagram, and result table are included in the served HTML. JavaScript is only needed to recalculate after you change an input.

Which unit should I use?

Use the imperial page for US customary inputs or open the metric twin for millimetres, centimetres, and metres.

Can I use the result for purchasing material?

Use it as a quantity and layout check, then add the stated waste allowance and confirm package coverage, stock dimensions, and field conditions.

Does this replace building code or an engineer?

No. The calculator is a planning aid. Current local code, product documentation, and a qualified engineer govern structural and life-safety decisions.

More calculators

iPhone companion

Keep jobsite math available offline

The website calculators and charts stay free. The BuildMath iPhone app keeps its supported construction calculations available when the jobsite has no connection.

View BuildMath on the App Store

Last reviewed .